DeletedUser
Guest
Encrypted Script said:NOT A BOT
Var
n00bs: Integer;
Procedure BAN;
begin
Getmodover;
Takecontrolofmod;
Makemodpressban;
end;
Procedure Getmodover;
begin
Getnoob(From,n00bbucket);
Makenoob(spam);
end;
Procedure Takecontrolofmod;
begin
Makenoob(Pointwatergunatmodshead);
Makenoob(usemindcontrol);
end;
Procedure Makemodpressban;
begin
Makenoobsay(OMG A SPAMMER!);
Makemod(pressban);
end;
Begin
repeat
BAN;
until(n00bs == 0)
end.
There, the mods will never be able to figure out we were using bots to hack. :icon_biggrin:
On topic: 8/8/5. I HAVE A SMITHY!