fidel I
Guest
Because you'll produce troops faster than those that have high pits. I hope that you don't lose troops anytime soon, for your own sake.
Thanks, but I'm sure I'll be alright
Because you'll produce troops faster than those that have high pits. I hope that you don't lose troops anytime soon, for your own sake.
Thanks, but I'm sure I'll be alright
You're 700 points. I'm sure you won't be.
Lets be optimistic.
A lot of people seem to think that points mean something even though they don't except maybe shows other players what type of village you are building.
And for those who think points will help you in the long run, you still have a a lot to learn.
A lot of people seem to think that points mean something even though they don't except maybe shows other players what type of village you are building.
And for those who think points will help you in the long run, you still have a a lot to learn.
Don't get me wrong, you'll be fine surviving as others noble as they won't pick you to noble due to low pits. Though at the time you have a full nuke, some nobles and have pits up, you'll have players with four villages knocking on your doorstep and you'll be crying to mumma over those six years of your life lost in something you're obviously no good in
Edit: Hahaha just re-reading this I didn't realise how mean I sound,... you should be more open to learning new ways of growth, as years the pass gameplay changes as new techniques and strategies are brought along.... No hard feelings?<3 hehe
Some great enemies you hadI'm used to having loads of players knocking at my door so I normally have a 3:1 ratio, but this is my first time being a total point whore.
I do things either my own way or what I've learned from other players (mostly enemies ) so I pretty much make it up as I go along.
I wont hold anything against you as from my point of view, you were just being honest.
Well I probably have more than youSome great enemies you had
And?Well I probably have more than you
He means he is bettter than you and you suck (nod). I think he is out of order saying that to you slow.
He means he is better than you and you suck (nod). I think he is out of order saying that to you slow.