Warehouse Overflow Warning when cancelling construction

Do you like this idea?


  • Total voters
    12
  • Poll closed .

THE MURPH ALL CAPS

Contributing Poster
Reaction score
948
There should be a warning stating how much resources will be lost through warehouse overflow if you cancel an assignment.

It is not clear how much resources your current build costs without going to a table to calculate it.

Alongside the following warning: "Are you sure you want to remove this assignment from the building queue?" It should state your warehouse will overflow if you continue with this action.

Only a minor tweak required but a good one imo.
 

- Mr. President

Well-Known Member
Reaction score
29
See screenshot attached.
I agree with this if an option is also added like the one we have to disable the quoted message box. In speeds it can be quite annoying due to how fast they are and sometimes its not that big of a deal cancelling stuff, but i can also see it being very useful sometimes.
Maybe adding it to unit queues too? Working the same way
 
Top